Service Packages

One of the first steps in developing an architecture is to identify the transportation services that are important to the Region. The following table lists each service package and its applicability to the Region. More information about each service package can be obtained by selecting the service package in the table below.

Service PackageService Package NameStatus
CVO02Freight AdministrationPlanned
CVO02–1Planned
CVO03Electronic ClearancePlanned
CVO03–1Planned
CVO03–2Planned
CVO04CV Administrative ProcessesPlanned
CVO04–1Planned
CVO04–2Planned
CVO06Freight Signal PriorityPlanned
CVO07Roadside CVO SafetyPlanned
CVO07–1Planned
CVO09Freight–Specific Dynamic Travel PlanningPlanned
CVO10Road Weather Information for Freight CarriersPlanned
CVO12HAZMAT ManagementPlanned
CVO12–1Planned
CVO12–2Planned
DM01ITS Data WarehousePlanned
DM01–1Planned
DM01–2Planned
DM01–3Planned
DM01–4Planned
DM01–5Planned
DM01–6Planned
DM01–7Planned
DM01–8Planned
DM01–9Planned
MC01Maintenance and Construction Vehicle and Equipment TrackingPlanned
MC01–1Planned
MC01–2Planned
MC02Maintenance and Construction Vehicle MaintenancePlanned
MC02–1Planned
MC02–2Planned
MC04Winter MaintenancePlanned
MC04–1Planned
MC04–2Planned
MC04–3Planned
MC04–4Planned
MC04–5Planned
MC05Roadway Maintenance and ConstructionPlanned
MC05–1Planned
MC05–2Planned
MC05–3Planned
MC05–4Planned
MC05–5Planned
MC06Work Zone ManagementPlanned
MC06–1Planned
MC06–2Planned
MC06–3Planned
MC06–4Planned
MC07Work Zone Safety MonitoringPlanned
MC08Maintenance and Construction Activity CoordinationPlanned
MC08–1Planned
MC08–2Planned
MC08–3Planned
MC09Infrastructure MonitoringPlanned
PM01Parking Space ManagementPlanned
PM01–1Planned
PM03Parking Electronic PaymentPlanned
PM03–1Planned
PM04Regional Parking ManagementPlanned
PM04–1Planned
PM06Loading Zone ManagementPlanned
PS01Emergency Call–Taking and DispatchPlanned
City of Columbus 311 Emergency Call–Taking and DispatchExisting
PS01–01Planned
PS01–02Planned
PS01–03Planned
PS01–04Planned
PS01–05Planned
PS01–06Planned
PS01–07Planned
PS01–08Planned
PS01–09Planned
PS01–10Planned
PS02Emergency ResponsePlanned
PS02–01Planned
PS02–02Planned
PS02–03Planned
PS02–04Planned
PS02–05Planned
PS02–06Planned
PS02–07Planned
PS02–08Planned
PS02–09Planned
PS02–10Planned
PS02–11Planned
PS02–12Planned
PS02–13Planned
PS02–14Planned
PS02–15Planned
PS03Emergency Vehicle PreemptionPlanned
PS03–1Planned
PS03–2Planned
PS03–3Planned
PS03–4Planned
PS03–5Planned
PS03–6Planned
PS07Incident Scene Safety MonitoringPlanned
PS08Roadway Service PatrolsPlanned
PS08–1Existing
PS09Transportation Infrastructure ProtectionPlanned
PS10Wide–Area AlertPlanned
PS10–1Planned
PS10–2Planned
PS10–3Planned
PS10–4Planned
PS10–5Planned
PS10–6Planned
PS11Early Warning SystemPlanned
PS11–1Planned
PS11–2Planned
PS12Disaster Response and RecoveryPlanned
PS12–1Planned
PS12–2Planned
PS12–3Planned
PS12–4Planned
PS13Evacuation and Reentry ManagementPlanned
PS13–1Planned
PS13–2Planned
PS14Disaster Traveler InformationPlanned
PS14–1Planned
PT01Transit Vehicle TrackingPlanned
PT01–1Planned
PT01–2Planned
PT01–3Planned
PT02Transit Fixed–Route OperationsPlanned
PT02–1Planned
PT02–2Planned
PT02–3Planned
PT02–4Planned
PT02–5Planned
PT03Dynamic Transit OperationsPlanned
PT03–1Planned
PT03–2Planned
PT04Transit Fare Collection ManagementPlanned
PT04–1Planned
PT04–2Planned
PT05Transit SecurityPlanned
PT05–1Planned
PT05–2Planned
PT05–3Planned
PT06Transit Fleet ManagementPlanned
PT06–1Planned
PT06–2Planned
PT07Transit Passenger CountingPlanned
PT07–1Planned
PT08Transit Traveler InformationPlanned
PT08–1Planned
PT08–2Planned
PT09Transit Signal PriorityPlanned
PT09–1Planned
PT09–2Planned
PT09–3Planned
PT09–4Planned
PT11Transit Pedestrian IndicationPlanned
PT12Transit Vehicle at Station/Stop WarningsPlanned
PT13Vehicle Turning Right in Front of a Transit VehiclePlanned
PT14Multi–modal CoordinationPlanned
PT14–1Planned
PT16Route ID for the Visually ImpairedPlanned
PT17Transit Connection ProtectionPlanned
PT18Integrated Multi–Modal Electronic PaymentPlanned
ST01Emissions MonitoringPlanned
ST01–1Planned
ST05Electric Charging Stations ManagementPlanned
SU01Connected Vehicle System Monitoring and ManagementPlanned
SU02Core AuthorizationPlanned
SU03Data DistributionPlanned
SU04Map ManagementPlanned
SU05Location and TimePlanned
SU06Object Registration and DiscoveryPlanned
SU07ITS CommunicationsPlanned
SU08Security and Credentials ManagementPlanned
SU09Device Certification and EnrollmentPlanned
SU12Vehicle MaintenancePlanned
TI01Broadcast Traveler InformationPlanned
TI01–1Planned
TI01–2Planned
TI01–3Existing
TI02Personalized Traveler InformationPlanned
TI02–1Planned
TI02–2Planned
TI06Dynamic Ridesharing and Shared Use TransportationPlanned
TI07In–Vehicle SignagePlanned
TM01Infrastructure–Based Traffic SurveillancePlanned
City of Columbus Infrastructure–Based Traffic SurveillanceExisting
Local Counties and Municipalities Infrastructure–Based Traffic SurveillancePlanned
ODOT TMC Infrastructure–Based Traffic SurveillanceExisting
Ohio State University Infrastructure–Based Traffic SurveillancePlanned
TM02Vehicle–Based Traffic SurveillanceExisting
TM02–1Planned
TM03Traffic Signal ControlPlanned
TM03–1Planned
TM03–2Planned
TM03–3Planned
TM03–4Planned
TM03–5Planned
TM04Connected Vehicle Traffic Signal SystemPlanned
TM05Traffic MeteringPlanned
TM05–1Planned
TM06Traffic Information DisseminationPlanned
TM06–1Planned
TM06–2Planned
TM06–3Planned
TM06–4Planned
TM07Regional Traffic ManagementPlanned
TM07–1Planned
TM07–2Planned
TM08Traffic Incident Management SystemPlanned
TM08–01Planned
TM08–02Planned
TM08–03Planned
TM08–04Planned
TM08–05Planned
TM08–06Planned
TM08–07Planned
TM08–08Planned
TM08–09Planned
TM08–10Planned
TM08–11Planned
TM08–12Planned
TM08–13Planned
TM08–14Planned
TM08–15Planned
TM13Standard Railroad Grade CrossingPlanned
TM13–1Planned
TM13–2Planned
TM13–3Planned
TM14Advanced Railroad Grade CrossingPlanned
TM15Railroad Operations CoordinationPlanned
TM15–1Planned
TM17Speed Warning and EnforcementPlanned
TM17–1Planned
TM17–2Planned
TM19Roadway Closure ManagementPlanned
TM21Speed HarmonizationPlanned
TM22Dynamic Lane Management and Shoulder UsePlanned
VS01Autonomous Vehicle Safety SystemsExisting
VS01–1Planned
VS02V2V Basic SafetyPlanned
VS02–1Planned
VS03Situational AwarenessPlanned
VS05Curve Speed WarningPlanned
VS06Stop Sign Gap AssistPlanned
VS07Road Weather Motorist Alert and WarningExisting
VS08Queue WarningPlanned
VS09Reduced Speed Zone Warning / Lane ClosurePlanned
VS12Pedestrian and Cyclist SafetyPlanned
VS13Intersection Safety Warning and Collision AvoidanceExisting
VS13–01Planned
VS14Cooperative Adaptive Cruise ControlPlanned
VS15Infrastructure Enhanced Cooperative Adaptive Cruise ControlPlanned
VS16Automated Vehicle OperationsExisting
WX01Weather Data CollectionExisting
WX01–1Planned
WX01–2Planned
WX01–3Planned
WX02Weather Information Processing and DistributionPlanned
WX02–1Planned
WX02–2Planned
WX03Spot Weather Impact WarningPlanned